PROJECT DETAILS

The original house of worship was destroyed by a fire on Christmas 2005. The church moved to a temporary facility until 2009 when the new location was completed with DVO’s engineering design.

  • needs // M.E.P ENGINEERING
  • industry // Religious
Download Religious PDF